Been thinking about Joe's suggestion of moving the meter signal wires from the backplanes to the DCP. I like it as it gets the last of those soldered 22 AWG wires off the backplane and just makes good common sense. The amps capacitors will be charged before signal is put to the meters, per the DCP delay. Pretty sure I have some miniature ring terminals, but will have to dig and look.
Last edited: