Derek92994's 700 Ser II White Oak conversion

laatsch55

Administrator,
Staff member
Joined
Jan 14, 2011
Messages
74,758
Location
Gillette, Wyo.
Tagline
Halfbiass...Electron Herder and Backass Woof
Darc, I gotta shit, shower and shave for date night..I'll be watchin from the bar, you're in good hands with Joe..

Leave red on the left, black on the middle..
 

Gepetto

Administrator
Staff member
Joined
May 15, 2011
Messages
13,915
Location
Sterling, MA
Tagline
Old 'Arn Enthusiast
Hi Darcy
For Q1 you should get readings approximating these. Q1 is NPN. Q1 pinout is B-C-E when looking at the face of the part with leads pointing downward.

B+C- means you plus probe is on B or base and your minus probe is on C or collector. That is the nomenclature below:

B+C- = 604
B+E- = 605
C+E- = 745
C-E+ = Open
B-C+ = Open
B1E+ = Open

Record your results in a list like this.
 

derek92994

Veteran and General Yakker
Joined
May 1, 2013
Messages
7,226
Location
Australia
Tagline
Those who enter the man cave will get WOPLed
Hi Darcy
For Q1 you should get readings approximating these. Q1 is NPN. Q1 pinout is B-C-E when looking at the face of the part with leads pointing downward.

B+C- means you plus probe is on B or base and your minus probe is on C or collector. That is the nomenclature below:

B+C- = 604
B+E- = 605
C+E- = 745
C-E+ = Open
B-C+ = Open
B1E+ = Open

Record your results in a list like this.
Thanks joe, im starting the testing now
 

Gepetto

Administrator
Staff member
Joined
May 15, 2011
Messages
13,915
Location
Sterling, MA
Tagline
Old 'Arn Enthusiast
Then after getting that list, do the same for the voltage reference VR1

For VR1 you should get readings approximating these. VR1 pinout is R-A-C when looking at the flat face of the part with leads pointing downward.

R+A- means you plus probe is on R or reference and your minus probe is on A or anode. That is the nomenclature below:

R+A- = Open
R+C- = 789
A+C- = 605
R-A+ = 672
R-C+ = Open
A-C+ = Open

Record your results in a list like this.

Good luck! Power off for all readings. Diode scale for all readings.
 

derek92994

Veteran and General Yakker
Joined
May 1, 2013
Messages
7,226
Location
Australia
Tagline
Those who enter the man cave will get WOPLed
Results: (For Q1)

B+/C- =554
B+/E- =560
C+/E- =1280
C-/E+ = Out of range (1)
B-/C+ = Out of range (1)
B-/E+ = Out of range (1)
 

derek92994

Veteran and General Yakker
Joined
May 1, 2013
Messages
7,226
Location
Australia
Tagline
Those who enter the man cave will get WOPLed
Results: VR1

R+/A- = 225
R+/C- = 231
A+/C- = Multimeter Beeps (Like when you touch probes together)
R-/A+ = 224
R-/C+ = 231
A-/C+ = Multimeter Beeps
 

Gepetto

Administrator
Staff member
Joined
May 15, 2011
Messages
13,915
Location
Sterling, MA
Tagline
Old 'Arn Enthusiast
I recommend you cut out VR1 since it does not work anyway and retake the measurements on Q1. I want to see whether it is walking wounded or not. I am suspecting it may be but cannot tell with VR1 affecting the circuit. You are dead in the water until this is fixed anyway so it really won't put you in any worse of a situation.
 

derek92994

Veteran and General Yakker
Joined
May 1, 2013
Messages
7,226
Location
Australia
Tagline
Those who enter the man cave will get WOPLed
I recommend you cut out VR1 since it does not work anyway and retake the measurements on Q1. I want to see whether it is walking wounded or not. I am suspecting it may be but cannot tell with VR1 affecting the circuit. You are dead in the water until this is fixed anyway so it really won't put you in any worse of a situation.
Ok Will do
 

derek92994

Veteran and General Yakker
Joined
May 1, 2013
Messages
7,226
Location
Australia
Tagline
Those who enter the man cave will get WOPLed
I recommend you cut out VR1 since it does not work anyway and retake the measurements on Q1. I want to see whether it is walking wounded or not. I am suspecting it may be but cannot tell with VR1 affecting the circuit. You are dead in the water until this is fixed anyway so it really won't put you in any worse of a situation.
The Measurements on Q1, power off with diode scale? I have de-soldered VR1
 

derek92994

Veteran and General Yakker
Joined
May 1, 2013
Messages
7,226
Location
Australia
Tagline
Those who enter the man cave will get WOPLed
Re-take Measurements of Q1 using diode test on DMM

B+/C- = 556
B+/E- = 561
C+/E- = 715
C-/E+ = Out of Range
B-/C+ = Out of Range
B-/E+ = Out of Range

** C+/E- went from 1280 to 715 after removing VR1
 

Gepetto

Administrator
Staff member
Joined
May 15, 2011
Messages
13,915
Location
Sterling, MA
Tagline
Old 'Arn Enthusiast
Re-take Measurements of Q1 using diode test on DMM

B+/C- = 556
B+/E- = 561
C+/E- = 715
C-/E+ = Out of Range
B-/C+ = Out of Range
B-/E+ = Out of Range

** C+/E- went from 1280 to 715 after removing VR1
Q1 Appears OK which is good, VR1 is dead tho
 
Top