- Joined
- Jan 14, 2011
- Messages
- 75,398
- Location
- Gillette, Wyo.
- Tagline
- Halfbiass...Electron Herder and Backass Woof
Wrong thread...Nav.... but possible. He's quite the lurker.....
Wrong thread...Nav.... but possible. He's quite the lurker.....
Man, I gotta grab the cat and get to bed, Timdalf is coming by at 7 to go get Kev's K's and take em to his place. We're gonna load the woofs in the bass bins and redo the woofer cover and then move the Soniphase bass bins out and break in Kev's K's for him......I mean finding 2 guys to go through all that time and trouble to break out a guys speaks for him?? I mean , jeez, it'll probably take 2 months....
I fully understand - an accelerated test plan. Good stuff. Is Timdalf getting the 700B? Hope so.There's a power/time curve.....more power less time. Sooooooooo......considering Timfalf and I .......2 months will do it....
Yes, he's getting the one out of Kirkland, Wa. And he's tickled shitless. The 400 just won't push those big EVX-155's in the Soniphase to the levels we prefer. Now a 400 on the K's will keep him outta trouble till his 700 is done..
Careful?????????????????????
Which was headed in to snuggle up next to Hottie and the cat. Nite, it was fun trading barbs....
Which was headed in to snuggle up next to Hottie and the cat. Nite, it was fun trading barbs....