Hi Ray
From the light board document provided:
1.Wiringfrom amplifier to Light Board RevB is as follows:
a.PAD1= RED, right channel output
b.PAD2= WHITE, left channel output
c.PAD3= BLACK, amplifier star point ground
d.PAD4= GRAY, AC1 from the main transformer (sometimes these leads are green or someother color)
e.PAD5= GRAY, AC2 from the main transformer (sometimes these leads are green or someother color)
f.Thelast 2 AC wires are interchangeable, no polarity involved.
2.Usethe nylon washers provided to space the Light Board off of the back of themeter such that the round body of the LEDs just kisses or is slightly off ofthe front plastic jewel lens. Gettingthe LEDs as close to the lens as possible without crushing or bending the LEDsor LED leads against the lens helps to maximize the light dispersion via totalinternal reflection against the meter lens inner surface. A dozen #6 x 1/16†thick washers have beenprovided for this purpose. Mostapplications require either one or two nylon washers stacked on each screw studunder the light board and above the meter case to get the recommended LED spacing. Put the last 4 nylon washers on top of theLight Board before installing the hex nuts provided to prevent scuffing of thePCB surface. DO NOT OVERTIGHTEN THE NUTSON THE METER STUDS. A gentle tighteningis all that is required.