700 Series II Build

Housing assembly started with backplanes boards and heat sink fins installed.

IMG_8197-4K.jpg


IMG_8199-4K.jpg


IMG_8200-4K.jpg
DM Sent
 
Made some progress over the past few days.

Caring for elder parents is starting to take a toll on free time outside of the day job.

Cylon LED meters fully assembled and cleaned.

All remaining components thoroughly cleaned and mounted to mid-plate .

IMG_8225-4K.jpg


IMG_8227-4K.jpg


IMG_8226-4K.jpg


IMG_8229-4K.jpg
 
All non-control board wires terminated and ready for initial power up testing.

IMG_8231-4K.jpg


AC and fuse holder wire terminationed with service loops to prevent stress on solder joints when inserting fuses..

IMG_8214-4K.jpg


Triac power switch installed between backplane boards.

IMG_8236-4K.jpg


IMG_8239-4K.jpg
As always, you set the standard Eric, beautiful work !!!!
 
Initial power up testing completed without issue and all measured voltages as expected. Time to stab all the output drivers into place.

The transformer is healthy at +/-105V DC rails and 12V AC Cylon meter supply.

IMG_8241-4K.jpg


Control board supplies at +/- 15V DC.

IMG_8243-4K.jpg
 
Man I can not wait to get that thing playing in the shop!
Killer work Eric!
Really appreciate you going out of your way to answer all my questions and all the advice on setting my system up.
 
Back
Top