700 Series II Build

Vintage 700b

Chief Journeyman
Joined
Mar 13, 2019
Messages
793
Location
Wisconsin
Tagline
Fabricator
#26
All non-control board wires terminated and ready for initial power up testing.



AC and fuse holder wire terminationed with service loops to prevent stress on solder joints when inserting fuses..



Triac power switch installed between backplane boards.



As always, you set the standard Eric, beautiful work !!!!
 
Top