Not sure the factory followed that logic...It is not “the bigger the blob, the better the job”
Not sure the factory followed that logic...It is not “the bigger the blob, the better the job”
And BobC was an obvious investor in Kester...Well....that was in Washington .....in the 70's...
Yes, thank you very much!!Eric did you get the meter bracket I sent your way?
A strong one. I think Lee had one that was +/- 108VDC.Power supply at +/- 103.9V with 120V AC input.
That's why you don't put 100V bulk caps in these...A strong one. I think Lee had one that was +/- 108VDC.
That's why you don't put 100V bulk caps in these...