Still need a wire placed between control board Phoenix connector 5R and the buss bar.
And if and when you do that, remove the ground bus wire on the back side of the board assembly. The separate ground wire from 5R to the bus bar will serve that purpose.

Leave the 2 upper power bus wires in place however. Just the lower ground bus wire.
 
Joined
Sep 12, 2024
Messages
119
Slow and ready as she goes. Took a minute to figure out that the heatsinks are directional, installed first row of outputs from right to left (transformer to input jacks) mj21196/rca66546/mj21196/rca65546 along the bottom row using silipads rather than mica and grease. verified no shorts collector to ground.
Went through the entire backplane once more looking for any metal fragments and checking for possible contact point interference, found the second cold solder joint on one of the emitter resistor tie down points and re attached. Re routed the input wiring to run along the side of the unit next to the speaker relay. Left side done, out of time for the day. Will mount all the TO-92 heat sinks once the right side wiring is done just before start up on the dbt. Getting real close now.

1731361870351.jpeg
 
Last edited:
Joined
Sep 12, 2024
Messages
119
Wiring finished, heat sinks installed. Need a final look over by the distinguished panel before I hook up the Variac and my DBT tomorrow.
Have the initial test/startup instructions from WOPL printed and will follow exactly.
Will say this has been quite the project :)


1731376464960.jpeg

1731376482796.jpeg
 
Joined
Sep 12, 2024
Messages
119
Once I get things up and running need a suggestion for the power and over temp lamp assemblies along with the attendant turret bar that attaches to the faceplate. The original is doa and so is one of the bulb leads.
 